Energy & Renewables

Red7Marine’s vessels are fully equipped for operations and maintenance work in the wind farm and renewables sectors. With an expert consultancy team, we work closely with project partners to provide safe working solutions.

Renewables

Renewables

Client led demand has seen Red7Marine launch a purpose built monohull barge, Eurojack 3923 with a maximum deck load of 800t to operate within the renewables industry. This extremely versatile barge is ideal for providing cost effective operations within both the heavy civil engineering sector and servicing the expanding renewable energy market.

Operating in accordance to industry recognised standards and guidance, including publications by Renewable UK, our marine team can offer effective and safe solutions.

Our proven track record includes, but is not limited to projects such as cable landings and installations, tidal and hydroelectric power, nuclear construction and decommissioning and site investigation.

Expanding Fleet

Red7Marine has launched a specialist monohull barge for the renewable market.

Compliant

Red7Marine’s marine construction experts operate in accordance with recognised industry standards and guidance, including publications by Renewable UK, to offer cost effective and safe solutions.

Cable Landings

Red7Marine was recently involved in a cable landing installation on Burbo Bank Wind Farm.

Get in touch with our expert team

or speak to our team: 01255 886710

British Standards ISO British Standards ISO British Standards ISO Achilles Building Confidence IEMA Construction Line Chas Ijuboa CPA National Workboat Association ICE Mates in Mind AF Covenenant Gold award

“Falmouth Divers Ltd contracted Red7Marine at the end of 2019 to undertake the installation of two rock-socketed piles at the Jupiter Point Royal Naval training facility near Torpoint. Red7Marine mobilised its SeaSeven jack-up vessel from Liverpool and transited it to Plymouth in early January through a gap in the seasonally bad weather. The mobilisation was conducted efficiently within a week as planned.”

Garry Duff, Engineer Falmouth Divers